Crane Lift in Bausch + Lomb

Final lift of the day

Reeving the hook

Lifting in equipment

With the arrival of new plant items for the compressed air system. This plant needed to be craned onto the roof and then moved into position.

A 350-ton crane with additional jib sections were required due to the lifting distance.

A smaller crane was required to install the additional jib sections.

The lift was successfully completed on Saturday the 3rd of December lifting a compressor, receiver and dryer. The equipment was moved from the roof into the plantroom.

Receiver lifted out of truck with Area 8 in the background

The crane showing its big reach